1. HEAT EXCHANGERS AND PRESSURE VESSELS
Investor |
Description of referenced work |
Weight |
Performance year |
JKP Beogradske elektrane – TO Cerak | Heat Exchanger 58MW |
22.000 kg |
2015. |
JKP Beogradske elektrane – TO Konjarnik | Heat Exchanger 70MW |
43.000 kg |
2015. |
Standard Gas – Novi Sad | Column C-11 (Ø1.350 x 42.000mm) |
63.000 kg |
2015. |
HIP Petrohemija – Pančevo | Pipe bundles for heat exchanger T-6 and T-68 |
60.000 kg |
2015. |
Astec Engineering Austria | Making of cyclone, silo and reactors |
47.000 kg |
2015. |
JKP Beogradske elektrane – Beograd; TO Mirjevo | Distributor of hot water Ø800 and Ø700mm (3 pieces) |
15.000 kg |
2014. |
HIP Petrohemija – Pančevo | Tube bundle for exchanger T-6 |
17.500 kg |
2014. |
HIP Petrohemija – Pančevo | Tube bundle for exchanger T-68 |
27.000 kg |
2014. |
JKP Beogradske elektrane TO Miljakovac | Heat exchanger hot water – hot water, power 58MW |
23.300 kg |
2014. |
Industrija skroba “Jabuka” – Pančevo | Dismantling, fabrication and installation of tube bundle for bran and gluten dryer |
36.000 kg |
2014. |
JP Elektroprivreda Srbije TE Kostolac | Heater for low pressure ZNP-3 |
15.000 kg |
2014. |
“SUNOKO” Sugar factory Pećinci | Stainless steal vapor exchangers 40F01 i 40HE01 |
8.800 kg |
2014. |
“SUNOKO” Sugar factory Pećinci | Stainless steel evaporators for MDS plant |
198.000 kg |
2013. |
JP Elektroprivreda Srbije TENT Železnički transport | Heat Exchangers 23,8MW + 14,5MW |
10.000 kg |
2013. |
JKP Beogradske elektrane TO Cerak | Heat exchanger hot water – hot water, power 58MW |
4.060 kg |
2013. |
“SUNOKO” šećerana Pećinci | Steam dryer pressure vessel fabrication Ø4170x38x9400 |
310.000 kg |
2012. |
JP Elektroprivreda Srbije TENT A | Heat exchanger 20MW + 7MW |
4.060 kg |
2012. |
NIS – Rafinerija nafte Pančevo | Heat exchanger, area 300m2 |
7.354 kg |
2012. |
JKP Beogradske elektrane TO Cerak | Heat exchanger hot water – hot water 58MW |
22.830 kg |
2012. |
AD MSK Kikinda | Heat exchanger 3105A/B |
33.000 kg |
2012. |
2. COOLERS
Investitor |
Description of referenced works |
Weight |
Performance year |
Soda So – Lukavac Bosnia and Hercegovina | Air heater LUVO |
47.500 kg |
2014. |
Železara Smederevo | Convector gas cooler (VOKG) – Panels upward-downward – Protection shield |
15.000 kg |
2013. |
Železara Smederevo | Convector gas cooler (VOKG) – Panels upward-downward – Lower part of cooler “RUŽA” |
109.050 kg |
2011. |
Železara Smederevo | Lower part of cooler “RUŽA” |
22.000 kg |
2010. |
3. MILL PLANTS
Investitor |
Description of referenced works |
Weight |
Performance Year |
JP Elektroprivreda Srbije TE Morava Svilajnac | Production and delivery of parts of the fan coal mill N.90.60 |
41.500 kg |
2015. |
JP Elektroprivreda Srbije TE Morava Svilajnac | Making Forged casing mill N.90.60 |
58.800 kg |
2015. |
JP Elektroprivreda Srbije TENT B Obrenovac | Rehabilitation of working coal mill rotor type N.400.42 mark L05, D13 (1+1 pcs) |
66.600 kg |
2015. |
JP Elektroprivreda Srbije TENT B Obrenovac | Rehabilitation of working coal mill rotor type N.400.42 (1+1 pieces) |
66.600 kg |
2015. |
Sisecam Soda So – Lukavac | Rehabilitation of working coal mill rotor 6 and 7 (2+2 pieces) |
10.750 kg |
2015. |
JP Electricity of Serbia TENT A3 | Channels of mixture air at mill plant |
80.000 kg |
2014. |
JP Electricity of Serbia TE Kostolac B | Rehabilitation of working coal mill rotor, type S270.45 (Ø3400mm), 2 pcs |
23.660 kg |
2014. |
JP Electricity of Serbia TE Morava Svilajnac | Rehabilitation of working coal mill rotor, type N90.60 (Ø2600mm), 2 pcs |
12.600 kg |
2014. |
JP Electricity of Serbia TE Kolubara | Rehabilitation of working coal mill rotor, type N170.50 (Ø3180mm), 2 pcs |
15.400 kg |
2014. |
JP Electricity of Serbia TENT A | Rehabilitation of working coal mill rotor, type N170.50 (Ø3180mm), 2 pcs |
15.400 kg |
2014. |
JP Electricity of Serbia TE Morava Svilajnac | Making new coal mill rotor: type N90.60 (Ø2600mm) |
12.600 kg |
2013. |
JP Electricity of Serbia TE Kostolac B | Recovery of coal mill rotor: type S270.45 (Ø3400mm), 4 pieces |
23.660 kg |
2013. |
Termoelektromont – Podgorica | Recovery of coal mill rotor: type S45.50 (Ø3400mm) for TE Pljevlja |
17.290 kg |
2012. |
JP Elektroprivreda Srbije TE Morava Svilajnac | Recovery of coal mill rotor: type N90.60 (Ø2600mm) left + right |
12.600 kg |
2012. |
JP Elektroprivreda Srbije TE Kostolac A | Recovery of coal mill rotor: type N220.50 (Ø3400mm) |
17.290 kg |
2011. |
JP Elektroprivreda Srbije TE Kolubara | Recovery of coal mill rotor: type N170.50 (Ø3180mm) |
15.400 kg |
2011. |
JP Elektroprivreda Srbije TENT B | Recovery of coal mill rotor: type N400.42, (Ø4100mm) No. D08 i D12 |
66.600 kg |
2011. |
JP Elektroprivreda Srbije TE Kolubara | Fabrication of hammer mill stator part K-4 |
30.000 kg |
2011. |
JP Elektroprivreda Srbije TE Kostolac A | Recovery of coal mill rotor: type N220.50 (Ø3400mm) |
17.290 kg |
2010. |
JP Elektroprivreda Srbije TE Kostolac B | Recovery of coal mill rotor: type N270.45 (Ø3600mm), pcs. 3 |
23.660 kg |
2010. |
JP Elektroprivreda Srbije TENT A6 | Fabrication of coal mill casing (pcs. 2) |
100.000 kg |
2010. |
JP Elektroprivreda Srbije TENT A6 | Transitional duct above casing (among part) with armor (pcs. 2) |
40.000 kg |
2010. |
JP Elektroprivreda Srbije TENT A6 | Purifier – sihter with armor at mill plant (pcs. 2) |
42.400 kg |
2010. |
JP Elektroprivreda Srbije TENT A6 | Sliding doors at mill plant (pcs. 2) |
16.000 kg |
2010. |
JP Elektroprivreda Srbije TENT A6 | Air mixture ducts at mill plant |
47.500 kg |
2010. |
4. BOILER PLANTS
Investitor |
Description of referenced works |
Weight |
Performance year |
Termoelektro Brčko – TE Kakanj | Creating 10 sets of heater tubes 5B |
17.500 kg |
2015. |
Termah – Beograd | Making convective beam and water heater pipe boiler |
55.400 kg |
2014. |
|
Termah – Belgrade | Making convective beam and water heater tube boiler |
22.000 kg |
2013. |
|
JKP Beogradske elektrane | Fabrication of panels for hot water boiler TO Zemun, TO N. beograd |
116.400 kg |
2011. |
|
JP Elektroprivreda Srbije TE Kostolac B | Fabrication of steam air heater (pcs 2) |
18.400 kg |
2010. |
5. ELECTROSTATIC PRECIPITATOR PLANTS (ESP)
Investitor |
Description of referenced works |
Weight |
Performance year |
JP Electricity of Serbia TENT A3 | Making of electrostatic precipitator plant |
1.500.000 kg |
2014. |
JP Elektroprivreda Srbije TE Kostolac B | Fabrication of ESP elements 2×348,5 MW |
426.000 kg |
2012. 2011. |
JP Elektroprivreda Srbije TENT B1 | Fabrication of ESP elements |
187.700 kg |
2012. |
JP Elektroprivreda Srbije TENT A6 | Fabrication of OFA ducts – ESP plant |
22.900 kg |
2010. |
Energoprojekt TE Kolubara A5 | Reconstruction of ESP plant (lift tower) |
23.685 kg |
2009. |
JP Elektroprivreda Srbije TE “Morava” | Vertical air mixture ducts – ESP plant |
15.700 kg |
2008. |
6. STORAGE TANKS
Investitor |
Description of referenced works |
Weight |
performance year |
Sunoko – Sugar factory Pećinci | Prefabrication tank of molasses V=12.000m³ (2 pieces) |
677.000 kg |
2013. |
Montaža Minel Pančevo for Sunoko – Sugar factory | Delivery of materials and prefabrication tank of molasses V=12.000m³ (2 pieces) |
677.000 kg |
2013. |
NIS – Rafinerija nafte Pančevo | Fabrication of diesel fuel tanks V=3300m³ FB25302, FB25303, FB25304 (pcs 3) |
530.000 kg |
2012. 2011. |
Montaža Minel Pančevo za NIS – Rafinerija nafte Pančevo | Vertical storage tank for liquid sulfur FB2454 |
18.400 kg |
2011. |
NIS – Rafinerija nafte Pančevo | Vertical storage tank for liquid sulfur FB2452 |
16.800 kg |
2009. |
JP Elektroprivreda Srbije TE Kolubara | Condicioner V=46m3, for ash hydro mixture preparation, pcs. 2 |
17.600 kg |
2009. |
7. STEEL STACKS
Investitor |
Description of referenced works |
Weight |
Performance year |
JKP Beogradske elektrane – TO Novi Beograd | Equipments for rehabilitation of chimney VK 1,2 i 3 |
100.000 kg |
2015. |
JKP Beogradske elektrane – TO Novi Beograd | Equipments for rehabilitation of chimney VK 1,2 i 3 |
50.000 kg |
2015. |
Euromong Ing – Beograd Fiat Automobili Kragujevac | Steel stack of boiler room Ø1420×17.000mm |
8.400 kg |
2011. |
Vladex – Beograd | Outer shell of steel stack – boiler room “Borča” Ø2000 x 50.000mm |
25.100 kg |
2010. |
Beogradske elektrane | Steel stack of boiler room Ø2500x30m |
18.850 kg |
2009. |
HIP Petrohemija – Pančevo | Steel stacks D201B i D201C dimensions Ø1940 x 40.000mm, pcs. 2 |
76.000 kg |
2008. |
8. SILOS
Investitor |
Description of referenced works |
Weight |
Performance year |
“HOLCIM” Novi Popovac | Fabrication of segments satellite (pcs 3) |
16.600 kg |
2010. |
JP Elektroprivreda Srbije TE Kolubara | Silo V=1200m3, for dry ash Ø8500 x 25.560mm |
86.000 kg |
2009. |
JP Elektroprivreda Srbije TE Kolubara | Steel ring around the silo V=1200m3, with anchors |
12.100 kg |
2009. |
“ICIKOM”d.o.o. | Cement silo V=125m³ (Ø3200) |
15.438 kg |
2009. |
DS Inženjering – Beograd | Cement silo V=80m3, with supporting structure, stairs, Ø2900 x 15.252mm, pcs. 3 |
17.500 kg |
2008. |
Petra Group – Beograd | Cement silo V=125m3, with supporting structure, stairs, Ø3200 x 17.215mm, pcs. 2 |
19.100 kg |
2008. |
“LAFARGE-BFC” Beočin | Clinker silo V=230t |
118.142 kg |
2007. |
9. STEEL STRUCTURE
Investitor |
Description of referenced works |
Weight |
Performance year |
Standard Gas Novi Sad | Production of steel construction around column C-11 |
16.500 kg |
2015. |
Standard Gas Novi Sad | Production of steel structures for technology platform |
44.000 kg |
2015. |
VNG – Novi Sad | Making of steel construction |
21.000 kg |
2015. |
Tecon – Beograd | The main girders of cranes 10t, 25t i 50t |
62.500 kg |
2014. |
MBA Miljković – Beograd Road Batajnica | Production, delivery and installation of galvanized wicket fence |
35.000 kg |
2014. |
“SUNOKO” Sugar factory Pećinci | Fabrication and delivery of steel structure of building for MDS plant |
396.000 kg |
2013. |
“SUNOKO” Sugar factory Pećinci | Fabrication and delivery of steel structure of building for Steam drier |
120.000 kg |
2013. |
NIS – Rafinerija nafte Pančevo | Fabrication and delivery of steel structure –Hydrogen Generation Unit (HGU) plant |
700.000 kg |
2012. 2011. |
Sunoko – Novi Sad | Fabrication, delivery and assembly of 6 pillars for Steam dryer pressure vessel and works on rings reinforcement |
20.800 kg |
2012. |
TTK – Beograd Auto put A-75, Dobanovačka petlja | Fabrication and assembly of portal carriers P i T |
21.900 kg |
2012. |
DSD Konstruktion – Novi Sad Ada Bridge | Fabrication of prohron pylon peak Ø1500 / Ø500 x 7000mm |
780 kg |
2012. |
Ingrap Omni – Valjevo | Fabrication of jardinière, fences,… for Savski square – Belgrade |
14.800 kg |
2012. |
Porr Bau Gmbh – Beograd Ada Bridge | Fabrication and assembly of pedestrian fences on bridge 1500m |
55.700 kg |
2012. |
Euromong Ing – Beograd Fiat Cars Kragujevac | Steel structure of pipe rack |
39.300 kg |
2011. |
Porr Bau Gmbh – Beograd Ada Bridge | Fabrication of roadway fences New Jersey at bridge access road, 600m |
21.800 kg |
2011. |
DSD Konstruktion – Novi Sad Ada Bridge | Steel structure of pylon peak with cover |
40.400 kg |
2011. |
DSD Konstruktion – Novi Sad Ada Bridge | Pedestrian fences on main bridge and on approaching ramps, 400m |
15.200 kg |
2011. |
Železara Smederevo | Fabrication and delivery of crane carriers, pcs 12 |
90.000 kg |
2011. |
Železara Smederevo | Covers – PML 12.17A (pcs 4) – PML 12.17B/R (pcs 4) |
9.400 kg |
2010. |
“PORR BAU” | Steel stairs and platform in pylon, Ada bridge |
22.350 kg |
2010. |
“INTER-KOP” | Steel sheeting of bridge carrier |
10.150 kg |
2010. |
10. OTHER
Investitor |
Description of referenced works |
Weight |
Performance year |
Premax | Production and delivery of the aluminum hull of boat Premax 39 |
3.000 kg |
2015. |
Balcke Durr -TE Medupi- JAR | Production and delivery of sealing plates (12+8 sets) |
49.000 kg |
2015. |
JP Electricity of Serbia TE Kostolac B | Collectors Ø1.200×20.000mm, 2 pieces for filter plant |
16.000 kg |
2014. |
NIS Oil Rafinery Pančevo | Making of flaps 1, 2 and 3 |
4.600 kg |
2014. |
JP Electricity of Serbia TE Kostolac B | Making the connection air boxes for REC heads |
7.500 kg |
2014. |
“Feromont inženjering” NIS-RNP | Anticorrosion protection of pipe supports and piping – Hydrogen Generation Unit (HGU) plant |
31.000 kg |
2011. 2012. |
JP Elektroprivreda Srbije TENT B | Antiabrasive protection elements of boiler pipe supports |
9.725 kg |
2011. |
“BOFOR-KGD” Loznica | Cutting of steel strips and plates with Plasma cutting machine |
10.000 kg |
2011. |
JP Elektroprivreda Srbije TE Morava | “T” profile fabrication |
2.250 kg |
2011. |
JP Elektroprivreda Srbije TE Morava | Steel rings and housings |
4.090 kg |
2011. |
“TOPLING” Beograd | “U” profile fabrication |
12.100 kg |
2011. |
JP Elektroprivreda Srbije “Kolubara” | Piping supports |
7.640 kg |
2011. |