1. HEAT EXCHANGERS AND PRESSURE VESSELS

Investor

Description of referenced work

Weight

Performance year

JKP Beogradske elektrane – TO Cerak Heat Exchanger 58MW

22.000 kg

2015.

JKP Beogradske elektrane – TO Konjarnik Heat Exchanger 70MW

43.000 kg

2015.

Standard Gas – Novi Sad Column C-11 (Ø1.350 x 42.000mm)

63.000 kg

2015.

HIP Petrohemija – Pančevo Pipe bundles for heat exchanger T-6 and T-68

60.000 kg

2015.

Astec Engineering Austria Making of cyclone, silo and reactors

47.000 kg

2015.

JKP Beogradske elektrane – Beograd; TO Mirjevo Distributor of hot water Ø800 and Ø700mm (3 pieces)

15.000 kg

2014.

HIP Petrohemija – Pančevo Tube bundle for exchanger T-6

17.500 kg

2014.

HIP Petrohemija – Pančevo Tube bundle for exchanger T-68

27.000 kg

2014.

JKP Beogradske elektrane TO Miljakovac Heat exchanger hot water – hot water, power 58MW

23.300 kg

2014.

Industrija skroba “Jabuka” – Pančevo Dismantling, fabrication and installation of tube bundle for bran and gluten dryer

36.000 kg

2014.

JP Elektroprivreda Srbije TE Kostolac Heater for low pressure ZNP-3

15.000 kg

2014.

“SUNOKO” Sugar factory Pećinci Stainless steal vapor exchangers 40F01 i 40HE01

8.800 kg

2014.

“SUNOKO” Sugar factory Pećinci Stainless steel evaporators for MDS plant

198.000 kg

2013.

JP Elektroprivreda Srbije TENT Železnički transport Heat Exchangers 23,8MW + 14,5MW

10.000 kg

2013.

JKP Beogradske elektrane TO Cerak Heat exchanger hot water – hot water, power 58MW

4.060 kg

2013.

“SUNOKO” šećerana Pećinci Steam dryer pressure vessel fabrication Ø4170x38x9400

310.000 kg

2012.

JP Elektroprivreda Srbije TENT A Heat exchanger 20MW + 7MW

4.060 kg

2012.

NIS – Rafinerija nafte Pančevo Heat exchanger, area 300m2

7.354 kg

2012.

JKP Beogradske elektrane TO Cerak Heat exchanger hot water – hot water 58MW

22.830 kg

2012.

AD MSK Kikinda Heat exchanger 3105A/B

33.000 kg

2012.


2.  COOLERS

Investitor

Description of referenced works

Weight

Performance

year

Soda So – Lukavac Bosnia and Hercegovina Air heater LUVO

47.500 kg

2014.

Železara Smederevo Convector gas cooler  (VOKG) – Panels upward-downward – Protection shield

15.000 kg

2013.

Železara Smederevo Convector gas cooler  (VOKG) – Panels upward-downward – Lower part of cooler “RUŽA”

109.050 kg

2011.

Železara Smederevo Lower part of cooler “RUŽA”

22.000 kg

2010.


3.   MILL PLANTS

Investitor

Description of referenced works

Weight

Performance

Year

JP Elektroprivreda Srbije TE Morava Svilajnac Production and delivery of parts of the fan coal mill N.90.60

41.500 kg

2015.

JP Elektroprivreda Srbije TE Morava Svilajnac Making Forged casing mill N.90.60

58.800 kg

2015.

JP Elektroprivreda Srbije TENT B Obrenovac Rehabilitation of working coal mill rotor type N.400.42 mark L05, D13 (1+1 pcs)

66.600 kg

2015.

JP Elektroprivreda Srbije TENT B Obrenovac Rehabilitation of working coal mill rotor type N.400.42 (1+1 pieces)

66.600 kg

2015.

Sisecam Soda So – Lukavac Rehabilitation of working coal mill rotor 6 and 7 (2+2 pieces)

10.750 kg

2015.

JP Electricity of Serbia TENT A3 Channels of mixture air at mill plant

80.000 kg

2014.

JP Electricity of Serbia TE Kostolac B Rehabilitation of working coal mill rotor, type S270.45 (Ø3400mm), 2 pcs

23.660 kg

2014.

JP Electricity of Serbia TE Morava Svilajnac Rehabilitation of working coal mill rotor, type N90.60 (Ø2600mm), 2 pcs

12.600 kg

2014.

JP Electricity of Serbia TE Kolubara Rehabilitation of working coal mill rotor, type N170.50 (Ø3180mm), 2 pcs

15.400 kg

2014.

JP Electricity of Serbia TENT A Rehabilitation of working coal mill rotor, type N170.50 (Ø3180mm), 2 pcs

15.400 kg

2014.

JP Electricity of Serbia TE Morava Svilajnac Making new coal mill rotor: type N90.60 (Ø2600mm)

12.600 kg

2013.

JP Electricity of Serbia TE Kostolac B Recovery of coal mill rotor: type S270.45 (Ø3400mm), 4 pieces

23.660 kg

2013.

Termoelektromont – Podgorica Recovery of  coal mill rotor: type S45.50 (Ø3400mm) for TE Pljevlja

17.290 kg

2012.

JP Elektroprivreda Srbije TE Morava Svilajnac Recovery of  coal mill rotor: type N90.60 (Ø2600mm) left + right

12.600 kg

2012.

JP Elektroprivreda Srbije TE Kostolac A Recovery of  coal mill rotor: type N220.50 (Ø3400mm)

17.290 kg

2011.

JP Elektroprivreda Srbije TE Kolubara Recovery of  coal mill rotor: type  N170.50 (Ø3180mm)

15.400 kg

2011.

JP Elektroprivreda Srbije TENT B Recovery of  coal mill rotor: type  N400.42, (Ø4100mm) No. D08 i D12

66.600 kg

2011.

JP Elektroprivreda Srbije TE Kolubara Fabrication of hammer mill stator part  K-4

30.000 kg

2011.

JP Elektroprivreda Srbije TE Kostolac A Recovery of  coal mill rotor: type  N220.50 (Ø3400mm)

17.290 kg

2010.

JP Elektroprivreda Srbije TE Kostolac B Recovery of  coal mill rotor: type  N270.45 (Ø3600mm), pcs. 3

23.660 kg

2010.

JP Elektroprivreda Srbije TENT A6 Fabrication of  coal mill casing (pcs. 2)

100.000 kg

2010.

JP Elektroprivreda Srbije TENT A6 Transitional duct above casing  (among part) with armor (pcs. 2)

40.000 kg

2010.

JP Elektroprivreda Srbije TENT A6 Purifier – sihter with armor at mill plant  (pcs. 2)

42.400 kg

2010.

JP Elektroprivreda Srbije TENT A6 Sliding doors at mill plant (pcs. 2)

16.000 kg

2010.

JP Elektroprivreda Srbije TENT A6 Air mixture ducts at mill plant

47.500 kg

2010.


 4.   BOILER PLANTS

Investitor

Description of referenced works

Weight

Performance

year

 
Termoelektro Brčko – TE Kakanj Creating 10 sets of heater tubes 5B

17.500 kg

2015.

Termah – Beograd Making convective beam and water heater pipe boiler

55.400 kg

2014.

Termah – Belgrade Making convective beam and water heater tube boiler

22.000 kg

2013.

JKP Beogradske elektrane Fabrication of panels for hot water boiler TO Zemun, TO N. beograd

116.400 kg

2011.

JP Elektroprivreda Srbije TE Kostolac B Fabrication of steam air heater (pcs 2)

18.400 kg

2010.


5.   ELECTROSTATIC PRECIPITATOR PLANTS (ESP)

Investitor

Description of referenced works

Weight

Performance

year

JP Electricity of Serbia TENT A3 Making of electrostatic precipitator plant

1.500.000 kg

2014.

JP Elektroprivreda Srbije TE Kostolac B Fabrication of  ESP elements 2×348,5 MW

426.000 kg

2012.

2011.

JP Elektroprivreda Srbije TENT B1 Fabrication of  ESP elements 

187.700 kg

2012.

JP Elektroprivreda Srbije TENT A6 Fabrication of  OFA ducts – ESP plant

22.900 kg

2010.

Energoprojekt TE Kolubara A5 Reconstruction of  ESP plant (lift tower)

23.685 kg

2009.

JP Elektroprivreda Srbije TE “Morava” Vertical air mixture ducts – ESP plant 

15.700 kg

2008.


6.   STORAGE TANKS

Investitor

Description of referenced works

Weight

performance

year

Sunoko – Sugar factory Pećinci Prefabrication tank of molasses V=12.000m³ (2 pieces)

677.000 kg

2013.

Montaža Minel Pančevo for Sunoko – Sugar factory Delivery of materials and prefabrication tank of molasses V=12.000m³ (2 pieces)

677.000 kg

2013.

NIS – Rafinerija nafte Pančevo Fabrication of diesel fuel tanks  V=3300m³ FB25302, FB25303, FB25304 (pcs 3)

530.000 kg

2012.

2011.

Montaža Minel Pančevo za NIS – Rafinerija nafte Pančevo Vertical storage tank for liquid sulfur  FB2454

18.400 kg

2011.

NIS – Rafinerija nafte Pančevo Vertical storage tank for liquid sulfur  FB2452

16.800 kg

2009.

JP Elektroprivreda Srbije TE Kolubara Condicioner V=46m3, for  ash hydro mixture preparation, pcs. 2

17.600 kg

2009.


7.   STEEL STACKS

Investitor

Description of referenced works

Weight

Performance

year

JKP Beogradske elektrane – TO Novi Beograd Equipments for rehabilitation of chimney VK 1,2 i 3

100.000 kg

2015.

JKP Beogradske elektrane – TO Novi Beograd Equipments for rehabilitation of chimney VK 1,2 i 3

50.000 kg

2015.

Euromong Ing – Beograd Fiat Automobili Kragujevac Steel stack of boiler room Ø1420×17.000mm

8.400 kg

2011.

Vladex – Beograd Outer shell of steel stack – boiler room “Borča” Ø2000 x 50.000mm

25.100 kg

2010.

Beogradske elektrane Steel stack of boiler room  Ø2500x30m

18.850 kg

2009.

HIP Petrohemija – Pančevo Steel stacks D201B i D201C dimensions Ø1940 x 40.000mm, pcs. 2

76.000 kg

2008.


8.  SILOS

Investitor

Description of referenced works

Weight

Performance

year

“HOLCIM” Novi Popovac Fabrication of segments satellite  (pcs 3)

16.600 kg

2010.

JP Elektroprivreda Srbije TE Kolubara Silo V=1200m3, for dry ash Ø8500 x 25.560mm

86.000 kg

2009.

JP Elektroprivreda Srbije TE Kolubara Steel ring around the silo V=1200m3, with anchors

12.100 kg

2009.

“ICIKOM”d.o.o. Cement silo V=125m³ (Ø3200)

15.438 kg

2009.

DS Inženjering – Beograd Cement silo V=80m3, with supporting structure, stairs, Ø2900 x 15.252mm, pcs. 3

17.500 kg

2008.

Petra Group – Beograd Cement silo V=125m3, with supporting structure, stairs, Ø3200 x 17.215mm, pcs. 2

19.100 kg

2008.

“LAFARGE-BFC” Beočin Clinker silo V=230t

118.142 kg

2007.


9.  STEEL STRUCTURE

Investitor

Description of referenced works

Weight

Performance

year

Standard Gas Novi Sad Production of steel construction around column C-11

16.500 kg

2015.

Standard Gas Novi Sad Production of steel structures for technology platform

44.000 kg

2015.

VNG – Novi Sad Making of steel construction

21.000 kg

2015.

Tecon – Beograd The main girders of cranes 10t, 25t i 50t

62.500 kg

2014.

MBA Miljković – Beograd Road Batajnica Production, delivery and installation of galvanized wicket fence

35.000 kg

2014.

“SUNOKO” Sugar factory Pećinci Fabrication and delivery of steel structure of building for MDS plant

396.000 kg

2013.

“SUNOKO” Sugar factory Pećinci Fabrication and delivery of steel structure of building for Steam drier

120.000 kg

2013.

NIS – Rafinerija nafte Pančevo Fabrication and delivery of steel structure –Hydrogen Generation Unit (HGU) plant 

700.000 kg

2012. 2011.

Sunoko – Novi Sad Fabrication, delivery and assembly of  6 pillars for Steam dryer  pressure vessel and works on  rings reinforcement 

20.800 kg

2012.

TTK – Beograd Auto put A-75, Dobanovačka petlja Fabrication and assembly of portal carriers P i T

21.900 kg

2012.

DSD Konstruktion – Novi Sad Ada Bridge Fabrication of  prohron pylon peak  Ø1500 / Ø500 x 7000mm

780 kg

2012.

Ingrap Omni – Valjevo Fabrication of  jardinière, fences,… for Savski square – Belgrade

14.800 kg

2012.

Porr Bau Gmbh – Beograd Ada Bridge Fabrication and assembly of pedestrian fences  on bridge 1500m

55.700 kg

2012.

Euromong Ing – Beograd Fiat Cars Kragujevac Steel structure of  pipe rack 

39.300 kg

2011.

Porr Bau Gmbh – Beograd Ada Bridge Fabrication of roadway fences New Jersey  at bridge access road, 600m

21.800 kg

2011.

DSD Konstruktion – Novi Sad Ada Bridge Steel structure of  pylon peak with cover

40.400 kg

2011.

DSD Konstruktion – Novi Sad Ada Bridge Pedestrian fences on main bridge and on approaching ramps, 400m

15.200 kg

2011.

Železara Smederevo Fabrication and delivery of crane carriers, pcs 12

90.000 kg

2011.

Železara Smederevo Covers – PML 12.17A (pcs 4) – PML 12.17B/R (pcs 4)

9.400 kg

2010.

“PORR BAU” Steel stairs and platform in  pylon, Ada bridge

22.350 kg

2010.

“INTER-KOP” Steel sheeting of bridge carrier

10.150 kg

2010.


10. OTHER

Investitor

Description of referenced works

Weight

Performance

year

Premax Production and delivery of the aluminum hull of boat Premax 39

3.000 kg

2015.

Balcke Durr -TE Medupi- JAR Production and delivery of sealing plates (12+8 sets)

49.000 kg

 2015.

JP Electricity of Serbia TE Kostolac B Collectors Ø1.200×20.000mm, 2 pieces for filter plant

16.000 kg

2014.

NIS Oil Rafinery Pančevo Making of flaps 1, 2 and 3

4.600 kg

 2014.

JP Electricity of Serbia TE Kostolac B Making the connection air boxes for REC heads

7.500 kg

2014.

“Feromont inženjering” NIS-RNP Anticorrosion protection of pipe supports and piping – Hydrogen Generation Unit (HGU) plant

31.000 kg

 2011.

 2012.

JP Elektroprivreda Srbije TENT B Antiabrasive protection elements of boiler pipe supports

9.725 kg

2011.

“BOFOR-KGD” Loznica Cutting of steel strips and plates with Plasma cutting machine

10.000 kg

2011.

JP Elektroprivreda Srbije TE Morava “T” profile fabrication

2.250 kg

2011.

JP Elektroprivreda Srbije TE Morava Steel rings and housings 

4.090 kg

2011.

“TOPLING” Beograd “U” profile fabrication

12.100 kg

2011.

JP Elektroprivreda Srbije “Kolubara” Piping supports

7.640 kg

2011.

About us

Company "Feromont Oprema" a.d. Pancevo (until 2007. year company was operated under the name Minel Oprema a.d.) is present since 1948. year in the market of mechanical engineering.

Saznajte više
Products

Feromont Oprema a.d. Pancevo produces a large number of products in the field of thermoenergetics, process, thermal power plants and industrial equipment and facilities

Saznajte više
Images
See photos of some of many large projects that have been implemented in recent years. Saznajte više